P a s t   B u i l d   N e w s

February 14th 2005: Planking nearly finished.

January 21st 2005: Still more planking.

December 30th 2004: Planking continues.

November 29th 2004: Planking continues.


Lute stern

Selecting Ezra's spars

November 15th 2004: Planking continues.


Oak top strakes

Oak top strakes

lute stern

John fitting port side beam shelf

October 26th 2004: Planking has started.


First plank

First plank

Lute stern

Stern

October 13th 2004: Ezra being framed.

 

October 5th 2004: Keel being laid.


Keel upright with stem and stern posts.

Andy planing the deadwood between keel and stern post.

Keel assembly being raised upright.
 

October 1st 2004: Cutting the mortise on the keel.


Luke cutting the mortise on the keel.

Luke cutting the mortise on the keel.

Andy cutting the rabbet line on the keel.

Andy cutting the rabbet line on the keel.

September 24th 2004: Assembling frames on the loft floor.


Assembling frames on the loft floor.

Planing frame

Stacked frame assemblies
 

September 2004: Lofting started at the end of August and frames and floors are already being cut.


Loft floor with floors cut out

Frame sections stacked for drying

Deck planking being cut out of opepe

Deck beams cut,beading put on and painted with primer

July 2004: Oak frames and Opepe backbone.


Opepe backbone

Opepe backbone

Oak frames
 

Back to top


Contact Sam or Ingrid
by e-mail: skippers@sailezra.co.uk
by phone: 0044 (0)1852 500363
by mobile: 0044 (0)7775 953252
printer-friendly printer-friendly
© Sail Ezra. All rights reserved. Web site provided by redkiteinternet | admin